Projects

Wesley Chapel: Septic System & Drain Field

Wesley Chapel: Septic System & Drain Field

Project Overview We were contracted to address issues with the property's restroom facilities. Upon thorough investigation, it was determined that the existing septic system was failing to properly leech into the drain field. Initially, we considered tying into the...

Sebastian: Retention Pond Cleanup

Sebastian: Retention Pond Cleanup

Project Overview Our team was asked to address an overgrown retention pond that was failing to drain stormwater runoff effectively. The inadequate drainage was causing overflow issues, creating liability concerns in the adjacent parking lot and attracting the...

Sun City Center: Asphalt Overlay

Sun City Center: Asphalt Overlay

Project Overview We were asked to assess the asphalt at this location. We determined that the base of the pavement was in excellent condition, but the top layer required extensive repair. For this reason, an asphalt overlay was the optimal choice to extend its...

Sun City Center: Drain Line

Sun City Center: Drain Line

Project Overview Our team received reports of multiple drain backups within the building, so we utilized a sewer camera to pinpoint the source of the problem. The culprit? A tree root had infiltrated the exterior drain line, causing a blockage. To address this issue...

Temple Terrace: ADA Ramp Installation

Temple Terrace: ADA Ramp Installation

Project Overview In accordance with the Americans with Disabilities Act (ADA) and Florida State building code regulations, it is imperative to establish clear, handicapped accessible paths from commercial building entrances to the nearest bus stops within specified...

More Projects Are on the Way!