Projects
Brandon: Site Development
Project Overview We were contracted to clear and prepare the backside of the property for future use, ensuring it was ready for new tenants to move in and have more accessible land. This included addressing several key areas to make the site clean, safe, and...
Wesley Chapel: Septic System & Drain Field
Project Overview We were contracted to address issues with the property's restroom facilities. Upon thorough investigation, it was determined that the existing septic system was failing to properly leech into the drain field. Initially, we considered tying into the...
Sebastian: Retention Pond Cleanup
Project Overview Our team was asked to address an overgrown retention pond that was failing to drain stormwater runoff effectively. The inadequate drainage was causing overflow issues, creating liability concerns in the adjacent parking lot and attracting the...
Sun City Center: Asphalt Overlay
Project Overview We were asked to assess the asphalt at this location. We determined that the base of the pavement was in excellent condition, but the top layer required extensive repair. For this reason, an asphalt overlay was the optimal choice to extend its...
Sun City Center: Drain Line
Project Overview Our team received reports of multiple drain backups within the building, so we utilized a sewer camera to pinpoint the source of the problem. The culprit? A tree root had infiltrated the exterior drain line, causing a blockage. To address this issue...
Temple Terrace: ADA Ramp Installation
Project Overview In accordance with the Americans with Disabilities Act (ADA) and Florida State building code regulations, it is imperative to establish clear, handicapped accessible paths from commercial building entrances to the nearest bus stops within specified...